Monday 31 October 2011

Children's Film - Second and third day of filming

On our second day of filming we planned to try and film the outside scene with also some establishing shots. We wanted to get this done to ensure that the outside setting remains the same throughout the opening whereas if we started filming on two separate days the lighting may be different.

We succeeded in completing the outside filming and some outside shots but also we completed one classroom shot as well. However we later found, after reviewing the footage, that two of the shots we had taken had problems with them. For example one shot had someone in the background who wasn't supposed to be there and the other had a piece of camera equipment in the background. To fix this we decided that on the third day we would need to redo these shots.

On the third day of filming our aims were to complete the classrooms scene but also, due to problems with earlier footage, to redo some outside shots. After completing all of this we would have finished our filming on time.

We finished our classroom scenes and corrected the outside scenes within thirty minutes of filming. We now have the editing and the soundtrack to do.

No comments:

Post a Comment

 
© 2009 12T2-45 CHILDRENS FILM 2011. All Rights Reserved | Powered by Blogger
Design by psdvibe | Bloggerized By LawnyDesignz